Track spike anchorage strength grading technology and adaptation schemes for different sleeper types

Jan 13, 2026 Leave a message

Track spike anchorage strength grading technology and adaptation schemes for different sleeper types

 

1. What are the formula optimization points of anchoring agent for spikes used in concrete sleepers?

The anchoring agent for spikes used in concrete sleepers is based on sulfur mortar, and its formula optimization needs to balance anchoring strength and anti-aging performance. First, the ratio of sulfur to cement should be controlled. When the sulfur content is 60%-65%, the compressive strength of the anchoring agent can reach more than 50MPa, which can meet the bearing requirements of concrete sleepers; excessive cement content will reduce the toughness of the anchoring agent, which is prone to cracking under vibration load. Second, 1%-2% graphite powder should be added as a toughening agent. Graphite powder can fill the internal pores of the anchoring agent, improve fatigue resistance, and avoid the separation of the anchoring agent from the spike due to long-term vibration. At the same time, the water-cement ratio should be strictly controlled. A water-cement ratio exceeding 0.15 will reduce the compactness of the anchoring agent, leading to the attenuation of anchoring strength. Finally, 0.5% anti-ultraviolet agent is added. Concrete sleepers are mostly exposed outdoors, and the anti-ultraviolet agent can delay the aging of the anchoring agent and extend the service life. The optimized sulfur mortar anchoring agent has an anchoring pull-out force of more than 80kN, which fully meets the application requirements of concrete sleepers.

 

rail spike fatcory


2. What are the material selection requirements and installation process points of spikes used in wooden sleepers?

Spikes used in wooden sleepers should preferably be made of carbon steel with excellent corrosion resistance, and the surface should be hot-dip galvanized with a galvanized layer thickness of not less than 80μm to prevent corrosion of the spikes by moisture and humus in the wood. The spike rod should be designed with a threaded shape, and the thread pitch should be controlled at 3mm. The threaded structure can increase the friction between the spike and the wooden sleeper, avoiding spike loosening caused by train vibration. The core of the installation process is pre-drilling treatment. The diameter of the drill hole should be 1mm smaller than the diameter of the spike. Pre-drilling can reduce the splitting damage to the wooden sleeper during spike installation and protect the structural integrity of the sleeper. A special spike hammer should be used for installation, and the hammering force should be controlled at 50-80N·m. Excessive force will cause the wooden sleeper to crack, while insufficient force will result in unstable spike anchoring. After installation, anti-corrosion ointment should be applied to the contact part between the spike and the sleeper to further isolate moisture and improve the service life of the spike.

 

rail screw spike


3. What are the testing methods and qualification criteria for spike anchoring strength?

The testing of spike anchoring strength adopts the pull-out test method, and the core equipment is a bolt pull-out tester. During the test, the fixture of the pull-out tester should be firmly connected to the top of the spike. During the test, a tensile force is applied uniformly at a speed of 5kN/min, and the tensile force value and displacement are recorded in real time. When the tensile force reaches the peak value and the spike slips or the anchoring agent cracks, the tensile force value at this time is the ultimate anchoring strength. For spikes used in concrete sleepers, the ultimate anchoring strength should be ≥80kN and the displacement ≤2mm to be qualified; for spikes used in wooden sleepers, the ultimate anchoring strength should be ≥40kN and there should be no obvious loosening of the spike to be qualified. The sampling ratio for testing should meet 3% of each batch and not less than 10 samples. If one sample is unqualified, double sampling is required, and if it is still unqualified, the entire batch of products will be scrapped. After the test, the reasons for unqualified samples should be analyzed. If the unqualified is caused by the anchoring agent formula, the formula should be adjusted in time for re-production.

 

Gnee rail spikes


4. What is the anti-freezing and thawing optimization scheme of the spike anchoring system in alpine regions?

The core problem of the spike anchoring system in alpine regions is the cracking of the anchoring agent and the corrosion of the spike caused by freeze-thaw cycles. The optimization scheme needs to start with the anchoring agent formula and the protective structure. First, adjust the anchoring agent formula, add 3%-5% antifreeze to the sulfur mortar. The antifreeze can lower the freezing point of the anchoring agent and avoid the cracking of the anchoring agent caused by the expansion of water when freezing at low temperatures. Second, wrap a 2mm-thick polyurethane foam layer around the contact part between the spike and the anchoring agent. Polyurethane foam has excellent thermal insulation performance, which can reduce the impact of low temperature on the anchoring agent. At the same time, increase the burial depth of the spike. The burial depth of the spike in the concrete sleeper is increased from 150mm to 180mm, which increases the contact area between the anchoring agent and the spike and improves the anti-freezing and thawing capacity. Finally, apply a waterproof coating on the surface of the anchoring agent to isolate rain and snow moisture from infiltrating the anchoring system and prevent the damage of freeze-thaw cycles to the anchoring strength. The optimized anchoring system can withstand the low temperature environment of -40℃, and the anchoring strength attenuation rate is ≤5% after 100 freeze-thaw cycles.


5. What is the cooperative stress mechanism between spikes and other fastening components?

As a basic component of the fastening system, the spike forms a cooperative stress system with elastic strips, bolts, pressure plates and other components to jointly constrain rail displacement. The lateral load generated during train operation is first transmitted from the pressure plate to the elastic strip, the elastic strip converts the load into elastic force and transmits it to the rail fastener, and then the fastener transmits the load to the spike. The spike needs to bear the pulling force and lateral shear force transmitted by the fastener. At this time, the anchoring agent evenly distributes the force of the spike to the sleeper, avoiding excessive local stress on the spike leading to loosening. When the stiffness of the elastic strip is insufficient, the lateral displacement of the rail increases, and the shear force borne by the spike will also increase accordingly. Therefore, the stiffness of the elastic strip needs to match the anchoring strength of the spike to ensure the stability of cooperative stress. If the bolt preload is insufficient, the friction between the fastener and the rail will decrease, and part of the load will be transferred to the spike, increasing the stress burden of the spike. Therefore, the precise control of bolt preload is crucial to cooperative stress.