Railway subgrade construction technology and quality control
- What is the main construction process of railway subgrade?
First, carry out construction preparations, including surveying and setting out, site clearing, etc. Then, conduct subgrade bed treatment. According to different geological conditions, methods such as replacement filling, compaction, and reinforcement are adopted to ensure that the subgrade bed has sufficient bearing capacity. Next, fill the subgrade filler in layers, controlling the thickness of each layer, generally not exceeding 30 cm. Use large - scale compaction machinery for rolling to ensure that the compaction degree meets the design requirements. After filling, construct slope protection and drainage facilities, such as setting up retaining walls, slope protection, and laying drainage pipes. Finally, conduct subgrade settlement observation to monitor the stability of the subgrade.

- What factors affect the compaction quality of railway subgrade?
The main factors include the properties of subgrade filler, such as particle size, water content, and plasticity index. Fillers with good gradation and water content close to the optimum water content have better compaction effects. The type and performance of compaction machinery, heavy - duty road rollers have better compaction effects than light - duty road rollers. Compaction process parameters, such as the number of rolling passes, rolling speed, and compaction thickness, need to be adjusted reasonably according to the actual situation. Construction environment, such as temperature and humidity. In a high - temperature and dry environment, the water in the filler evaporates quickly, which is not conducive to compaction. While construction in rainy days may lead to water accumulation in the subgrade, affecting the compaction quality.

- How to conduct settlement observation and evaluation of railway subgrade?
Set settlement observation points at key parts of the subgrade, such as the center of the embankment and the shoulder. Use instruments such as level gauges and total stations to regularly observe settlement data. The observation frequency is encrypted in the early stage of construction and gradually decreases as the subgrade stabilizes. Through the analysis of the observed data, draw the settlement - time curve, and use mathematical models such as the hyperbola method and the three - point method for settlement prediction. When the settlement rate meets the design requirements and the cumulative settlement is within the allowable range, the subgrade settlement can be considered to tend to be stable and pass the evaluation. If the settlement is abnormal, it is necessary to analyze the reasons in time and take treatment measures such as reinforcement.

- What are the special requirements for subgrade construction under special geological conditions (such as soft soil foundation)?
For soft soil foundations, the drainage consolidation method is often used, such as setting up sand wells and plastic drainage boards to accelerate the drainage of water in the soft soil and improve the foundation strength. The deep mixing method is used to forcibly mix cement, lime and other curing agents with the soft soil to form piles or walls with integrity, water stability and certain strength. Pile foundation forms such as CFG piles and pipe piles can also be used to transfer the load to the deep stable soil layer. During the construction process, the loading rate should be strictly controlled to avoid foundation instability, and settlement and lateral displacement observation should be strengthened to adjust the construction parameters in time.
- What are the types and functions of railway subgrade protection projects?
Slope protection includes plant protection, such as sowing grass, laying turf, and planting trees. The roots of vegetation are used to fix the soil and prevent slope scouring. Engineering protection, such as plastering, shotcreting, and masonry riprap slope protection, is used for slopes with severe weathering and easy to be scoured, enhancing the slope's weathering resistance and scouring resistance. Retaining protection includes retaining walls and anti - slide piles, mainly used to stabilize the subgrade slope, resist the soil sliding force, and prevent slope collapse. Scour protection changes the flow direction of water by setting up diversion structures such as spur dikes and longitudinal dikes, reducing the scouring of water on the subgrade, or using direct protection measures such as gabions and riprap to protect the slope toe from scouring damage.