Railroad Spike Installing Procedures

Mar 28, 2024 Leave a message

Railroad Spike Installing Procedures

Railroad spike installation is a critical process that requires attention to safety and precision. let us see them together.

Safety Precautions

Prioritize safety by implementing safety isolation facilities. Workers should remain within designated safety areas throughout the installation process, whether it's on a new road construction site or a traffic trunk road. Ensure a 1:1 ratio of security personnel to installation personnel on traffic trunk roads, and a 1:3 ratio in safety areas.

Prepare Installation Area

Verify the installation position and ensure it is smooth and flat. If the surface is scalable, cracked, or uneven, workers should make efforts to flatten the road.

Clean Installation Surface

Thoroughly clean the installation position using a brush and ensure it is completely dry before proceeding.

info-600-600

Apply Adhesive

Apply an appropriate amount of adhesive onto the surface of the railroad spike. Press the spike firmly into the correct installing position. Clean excess adhesive if necessary.

Install Aluminum-Made Spikes

If using aluminum-made spikes with pins, ensure that the hole depth is 1cm deeper than the pin depth, and the diameter of the hole is 2mm larger than the diameter of the spike pin.

Inspection

After installing the railroad spikes, conduct an inspection to ensure there are no spikes installed in the wrong direction or crookedly.

Removal of Safety Isolation Facilities

Once the spikes are securely fastened to the sleepers, typically after 4 hours of solidification, remove the safety isolation facilities.