Rail Joint Installation
The steps outlined provide a basic guide for rail joint installation, emphasizing safety and proper preparation. Let us see them together.
- Safety Precautions
Before beginning the installation process, it's essential to ensure safety by cutting off the power supply to relevant electrical apparatus and circuits. This prevents any accidents or interference during the installation process.
- Preparation
Gather all necessary components and materials for installation. This includes rail washers, which are important for maintaining proper spacing and alignment between the rail joint and the steel rails.
- Bolt Installation
Begin by installing bolts on the connecting sections of the rail joint. Ensure that each bolt is securely fastened to maintain the integrity of the joint. Proceed to install additional fish bolts on both the fish plate and the rail joint, following proper alignment and spacing guidelines.
- Oiling
Apply oil to the contacting areas of the rail joint and steel rails, as well as to the fish bolts. This helps reduce friction and corrosion, ensuring smooth operation and longevity of the rail joint.


