Installation Of ASCE 60 Lb Railway Clips

Feb 22, 2024 Leave a message

Installation of ASCE 60 lb railway clips

Proper installation of ASCE 60 lb rail clips is vital for rail track stability and safety. The process involves specific tools such as a rail clip applicator, torque wrench, hammer, punch, measuring tape, gloves, and goggles.

Installation Steps

Position the base plate on the tie and place the rail on top.

Center the rail clip over the base plate on the rail base.

Hammer the clip into place using a punch until tightly secured.

Use a rail clip applicator to apply the correct torque to clip bolts.

Repeat the process on the opposite side to complete the installation.

Common Mistakes

Over-tightening or under-tightening clip bolts.

Incorrect positioning of the rail clip.

Excessive force during hammering, leading to deformation or breakage.

Regular inspections are crucial, checking for wear, damage, or loosening of clip bolts. Promptly address any issues to prevent safety and efficiency issues in the rail track.

GNEE rail group